
Share:
At Kfar Masaryk’s agricultural cooperative, AGEERA deployed an 18.1 MWh battery energy storage system integrated with existing solar PV and biogas generators. Our AI-powered EMS analyzes the facility’s load profile to charge when energy is cheapest and discharge during peaks, optimizing power for irrigation, cooling, and core operations.
Integrating Tesla, REN, and MingYang systems, this project is the world’s first multi-OEM BESS site and Israel’s first bankable standalone behind-the-meter installation. Serving 300 households and extensive agricultural and industrial operations, AGEERA’s EMS manages tens of thousands of data points in real time, enabling load-shifting, peak-shaving, voltage and frequency regulation, and seamless backup and islanding.
This project demonstrates how AGEERA’s intelligent energy management delivers financial efficiency, grid stability, and energy resilience for complex aggrotech environments.


